Project Overview

Client: Vindhya Telelinks Ltd. (MP Birla Group), Noida.
Location – Varanshi (UP)
Nature of Project – IPDS
Completion Date – Jun-19
Work Description – 33 & 11Kv UG Cables approx. 60 km.
Work Done Value – 8.73Cr

T&D Project

Project Details

Under the Integrated Power Development Scheme (IPDS), Multi Infra successfully executed the laying of 33kV and 11kV underground (UG) cables to modernize and strengthen the power distribution network in Varanasi.

Scope of Work

  • Supply, installation, and commissioning of approximately 60 km of 33kV & 11kV underground cables
  • Strengthening of power distribution infrastructure to improve network reliability
  • Integration with existing electrical grids, minimizing transmission losses
  • Adherence to high safety and operational standards

Impact & Outcome

  • Improved power reliability and reduced outages through modern UG cabling
  • Enhanced safety by replacing overhead lines with underground infrastructure
  • Strengthened electricity distribution for urban and commercial zones